Saturday 20 March 2010

The Storyboard Project

With this project, I have to admit I was somewhat guilty of neglecting it until the last minute, but I had prioritised the other projects too much, and with my health problems playing up from the strain of the other project work, and the death of a family pet looming over me, I was short on patience, energy, and the will to live by that point. If I had had the foresight to know how much work the projects would all take, I would have handled things significantly differently. But since none of us have that gift, my actions were perhaps not the best. I should have assigned more time to do this project, as it was, this reflected more than clearly in the work that I ended up handing in.

By the time I STARTED this assignment, my drawing arm was already crippled from my old friend RSI, brought on from the other projects all being done at once, so what I managed to do with it was nothing short of a miracle... I should have asked for an extension on it, but being as stubborn as I am regarding that sort of thing, I insisted I could do it.

On reflection, I would have only needed another 24 hours to pull the drawing up to a far better standard, and put adequate detail into the actual storyboard itself... make it properly extended and detailed, instead of the short and rapidly deteriorating in quality mess I handed in. But one can live and learn, and next time I have that many projects dropped on me, I shall plan my time A LOT more carefully, to pull up the standard of ALL of them to a reasonable point.

No comments:

Post a Comment